Oxford A&P Showgrounds Stormwater Improvements – Burnett Street Oxford

This work is to improve stormwater drainage in Oxford. The work is expected to mitigate overland flow through residential properties downstream of the Oxford A&P Showgrounds.

This project aims to reduce overland flow and flooding experienced downstream of the Oxford A&P Showgrounds by installing a pipe sized for the 1-in-5-year event through an existing drainage easement to Burnett Street, constructing a bund within the Showgrounds to retain flow from larger storm events, and redirecting any overflow from the catchment into Pearson Park.

The proposed work will include
  • Constructing a bund along the northern and eastern boundaries of the Oxford A&P Showgrounds.
  • Regrading and reshaping of existing swales within the showgrounds.
  • Installing an inlet structure and a new pipe through 53 and 53A Burnett Street and connecting the pipe into the existing stormwater infrastructure.
  • Minor localised lowering work at Reids Lane footpath near southern end of the eastern Oxford A&P Showgrounds shelter belt.
  • Upgrading the existing culvert under the Church Street entrance to Oxford A&P Showgrounds.
  • Constructing soak pits.
  • Trimming tree branches along the shelter belt as required to form the bund.
  • Planting of the bund, including topsoil and grass seeding.
Timing of work

The work is scheduled between October to December 2026 during the hours of 7am to 6pm, Monday to Friday.

How the work may affect you

Please note that the Oxford A&P Showgrounds are private property.

Tree trimming machines, excavators and trucks will be on site as part of the construction works and working along the northern and eastern boundaries of the Oxford A&P Showgrounds.

Another notice will be provided before work is started.

General impacts
Weather

In the event of bad weather or unforeseen circumstances, the work may be delayed.

Safety

Please warn your children of the dangers posed by construction works. Ensure that they stay well back from the work site and they follow the directions of the workers.

Noise and dirt

Construction work is a noisy, dirty business - but please bear with us. We will be doing all we can to minimise the impact on your home. Your cooperation and patience will help us get the job done as quickly as possible. All work will be carried out between the stated hours and over week days only to help minimise the impact on the community.

Traffic impacts

Construction site access will be via the Oxford A&P Showgrounds entrance between 47 and 51 Church Street. When working on the pipeline installation at 53 Burnett Street footpath, closures will be in place.

Thank you for your patience while we complete this work. If you have any questions please do not hesitate to contact us.

For more information please contact

Mark Henwood
Project Engineer

Waimakariri District Council
Phone: 0800 965 468
Mobile: 027 363 9109
Email: mark.henwood@wmk.govt.nz