Mandeville Temporary Water Shut Down

Published: 05-Jul-2017

To comply with the New Zealand Drinking Water Standards, the treatment system at the Mandeville water head works is being updated.

Tap filling glass of waterTo complete this work, the water supply will be temporarily disconnected on Thursday 6 July 2017 for approximately eight hours. The new UV unit will be running from the end of the day, making water on this scheme compliant with The Drinking Water Standards for New Zealand.

Most on-site storage tanks should hold a minimum of 24 hours storage. During the temporary disconnection, we ask residents to conserve water.